FLS Moved a 190 metric tons boiler

  11. February 2017
FLS Moved a 190 metric tons boiler

The FLS Team completed the loading operations for a 190 metric tons boiler for the HALGO Power Project in the US. The Boiler was delivered from the production facility alongside the vessel in Masan Port, South Korea. The vessel is now on its way to New Orleans, USA where FLS Projects USA will ensure a smooth discharge.



Share this article:



See all news